Please be aware that there will be major gas and road works taking place on the Thanet Way between McDonald’s/ Reeves Way roundabout and Clover Rise with the project starting on Monday 20th May and lasting for approximately 5 weeks.

For safety and to maintain the traffic flow, for a period of time there will be a reduced speed limit in place and also temporary traffic lights. The purpose of the work is to replace old metal gas mains with new plastic pipe to ensure that gas is continually provided safely and reliably to the local area.

Although this doesn’t disturb direct access to any of our centres, it will impact the local and surrounding area.

Share This